Camp Winston Playground

Extracurricular

2023

Role: Design and Construction Phase (January - May 2023)
Client: Camp Winston
Collaborative: Team of 26 Students from 1st year to 4th year
Mentor: Vincent Hui, BES, MArch, MBA, MRAIC
Programs Used: Rhino, Revit, Lumion, Adobe Photoshop, Adobe Illustrator

Over the course of five months, I engaged in a collaborative design-build project with 26 fellow students from the Architectural Science program at Toronto Metropolitan University. Our main objective was to design and construct an inclusive and enjoyable playground, aimed at providing a recreational area for the youth at Camp Winston.

Camp Winston Playground - Image 1

Finished Playground

Camp Winston Playground - Image 2

Playground Modules

Camp Winston Playground - Image 3

In Construction

Camp Winston Playground - Image 4

In Construction